HOME > Product > Liquidity

Liquidity

Name : WINLOW-SP|(High-liquidity concrete)

Type : Standard Type

Download : 다운로드



WINFLOW-SP[Ⅰ]    High-liquidityconcrete


WINFLOW-SP[] is a high-liquidity concrete thatuses Naphthalene condensates plus Lignosulfonates asthe main ingredient. Concrete with poor workability is changed into a goodamount of workability without the differences in the amount of air, settingtime, and segregation of materials due to the dispersion effect on cementpaste. Especially, smooth constructability and easy workability ofhigh-liquidity concrete can be achieved by preventing the strength degradationcaused by adding water and the promotion of slump when placing concrete.

USAGE
*
High-qualityconcrete of general construction and civil engineering structures
*
Whenmanufacturing high fluidity concrete
 

DOSAGE
*
Typicalratios of 0.3% to 1.0% byweight of cement are suggested. Please test concrete to make sure each batchmeets the exact specification on site.


*
Afteradding it, the mixture is mixed for 2-3 minutes at the high-speed rotation andthen concrete is placed.

* Afteradding it 0.1% to concrete, an standard increase in slump is 2±0.5.

* Excessivecement in concrete can lead to the decrease in bleeding, segregation, and theamount of air.

 

ADVANTAGES
*
Excellentworkability can be easy when the liquidity is enhanced.
*
Thefinishing touch can be enhanced by reducing concrete bleeding.

* Itenhances the ability to pump.

* Theexcellent dispersion effect can be offered when mixing fly ash, slag, and silica fume.

* Increasedresistance to freeze and thaw cycles is provided

 

PROPERTIES
*
Appearance  : Light  brown liquid
*
Specific gravity   : 1.200±0.05(20℃)
*
pH        : 7.0±3.0


 

 

MixingDesign


 

 Class

 Gravel Size(mm)

 W/C(%)

S/A(%)

Unit weight (kg/㎥)

 W

 C

 S

 G

 AD

1

 25

 50.9

 46.2

163

 320

841

989

 2

 25

 52.8

46.2

169

320

834

980

-

 

TestResults


 

 Test Item

Admixture dosage (%)

 SLUMP (㎝)

 AIR (%)

 Bleeding (%)

 AIR

 Compressive strength  (MPa)

 Initial

 Final

 3Day

 7Day

 28Day

PLAN(1)

 -

 8.0

4.6

 100

 7;25

 9:45

  10.0

  10.0

 10.0

0.3

 17.0

4.4

 88

7:45

 9:50

 10.9

 10.3

 10.5

 0.5

 19.0

4.5

 86

7:50

 10:00

 10.3

 10.4

 10.3

PLAN(2)

-

11.0

4.8

 100

7:40

 9:55

 10.0

 10.0

 10.0

0.3

20.0

 4.5

 91

7:55 

 10:05

 10.6

 10.8

 10.4

0.5

 21.0

4.6

 90

8:10

 10:15

 10.3

 10.4

 10.2

 

이전 

목록